1.
THAT
a Rezoning Bylaw be prepared and advanced to First Reading on 2018 April 09,
and to a Public Hearing on 2018 April 24 at 7:00 p.m.
2.
THAT
the following be established as prerequisites to the completion of the
rezoning:
a.
The
submission of a suitable plan of development.
b.
The
deposit of sufficient monies, including a 4% Engineering Inspection Fee to
cover the costs of all services necessary to serve the site and the
completion of a servicing agreement covering all requisite services. All
services are to be designed to City standards and constructed in accordance
with the Engineering Design. One of the conditions for the release of occupancy permits will be the completion of all
requisite services.
c.
The
dedication of any rights-of-way deemed requisite.
d.
The
granting of any necessary easements, covenants, and Statutory Rights-of-Way including,
but not necessarily limited to:
·
Section
219 Covenant respecting floodproofing requirements;
·
Section
219 Covenant respecting the submitted geotechnical report;
·
Statutory
Rights-of-Way guaranteeing vehicular, pedestrian and cycling access across
private driveways;
·
Statutory
Rights-of-Way guaranteeing pedestrian and cycling access across on-site
pathways;
·
Easement
guaranteeing reciprocal access for vehicles across property lines;
·
Section
219 Covenant to assure the provision and continuing maintenance of
end-of-trip facilities for cyclists and bicycle storage rooms;
·
Section
219 Covenant restricting uses to those permitted within the Conceptual
Development Plan; and,
·
Section
219 Covenant ensuring Leadership in Energy and Environmental Design (LEED)
certification.
e.
The
submission of a suitable on-site stormwater management system to the approval
of the Director Engineering, the deposit of sufficient monies for its
provision, and the granting of a Section 219 Covenant to guarantee its
provision and continuing operation.
f.
The
provision of facilities for cyclists in accordance with Sections 4.1.8, 4.2.8
and 4.3.8 of this rezoning report.
g.
The submission
of a Site Profile and resolution of any arising requirements.
h.
The
provision of an adequately sized and appropriately located garbage handling
and recycling material holding space to the approval of the Director
Engineering and a commitment to implement the recycling provisions.
i.
The
submission of a detailed comprehensive sign plan in accordance with the
guidelines of the Master Plan.
j.
The
submission of a Site Profile and resolution of any arising requirements.
k.
The
submission of a construction access and phasing plan to the approval of the
Director Engineering.
l.
The
review of on-site industrial loading facilities by the Director Engineering.
m.
The
deposit of the applicable GVS & DD Sewerage Charge.
|